How Long a Camper Van Conversion Takes

Here's what happens in each stage and what stretches the timeline.

Titan Vans 3 min read 8 views

Our current lead time is 4–12 weeks from your deposit, depending on model and options. Chassis availability and the build queue move it, so your estimate confirms the date for your build. Here's what fills those weeks.

What's involved by model

Model What's Involved
Classic Modular cabinetry, removable components, standard electrical
Metis Murphy bed system, couch, outdoor kitchen plumbing
Ultra Bi-Slide bed, shower/sauna wet-room build-out, full systems

The range is mostly about options — a stock Classic sits at the short end; a Classic with a full suspension package, custom bumper and extra windows drifts toward the long end.

The stages, in order

  1. Secure the van. Every Titan price includes a new all-wheel-drive Sprinter or Transit, which we source for your build; most Titan builds include the van, but we also build on vans our customers already own. Chassis availability can move the date, so we ask about it early.

  2. Lock the design. Model, layout, finish options, and upgrades get finalized through our Build & Price tool or a direct consultation. A deposit secures your spot in the production schedule; the balance is due before delivery.

  3. Fabrication. Our in-house CNC machines cut cabinetry, galley components, and structural panels from the build's CAD files. This is where modular Classic builds move fastest — fewer custom-fit elements than Metis or Ultra's built-in furniture.

  4. Systems install. Electrical, plumbing, insulation, and the components that make the van livable — fridge, heater, water system. Ultra's shower/sauna room adds real time here; it's genuine wet-room plumbing, not a cosmetic add-on.

  5. Finish and detail. Upgrades like suspension, off-road armor, windows, and exterior accessories typically happen in this window, alongside final fit and finish on cabinetry.

  6. Quality check and delivery. Every system gets tested before handoff — we'd rather catch an issue on the shop floor than on your first night out.

What stretches the timeline

Off-road suspension and armor packages. A Van Compass install is a half-day to full-day job on its own; a Flatline bumper with winch integration and skid plates adds more. Bundle several of these into one build and you're adding real days, not hours.

Exterior upgrades generally. Running boards, wheel and tire packages, extended fuel tanks — each is scheduled as its own line item with its own install time, and they queue behind the core conversion.

Backordered components. Less common since most of what we install is manufactured in-house, but third-party parts — specific suspension components, certain electrical hardware — can occasionally hold a build at the finish line.

Custom requests outside standard configurations. The further a build departs from a standard Classic/Metis/Ultra layout, the more fabrication time it needs, by definition.

The honest caveat

"4–12 weeks" is measured from your deposit, so it already includes your place in the queue. Chassis availability and the build queue move it; ask us where the queue stands today and we'd rather tell you the real number than a flattering one.

Frequently asked

How long does a Sprinter van conversion take? Our current lead time is 4–12 weeks from your deposit, depending on model and options.

What's the fastest Titan model to build? The Classic — its modular, removable components need the least custom fitting.

Does the quoted build time include the wait before my build starts? Yes — the 4–12 weeks runs from your deposit, and your estimate confirms the date for your build.

Updated November 2, 2026

  • how long does a sprinter van conversion take
  • camper van build time
  • van conversion timeline
  • how long to build a camper van

0 Comments

Comments are reviewed before they appear.

No comments yet. Start the conversation.